Execution Plan Report Menu
The menu can be found from Reports » Production Reports »
Execution Plan as seen in the picture below

Execution Plan Report
The execution scheme contains many information so that the person
who will create it will have all the information necessary. So, the
first information set is about the joinery and material with which
it has been projected: Component name, Dimensions,
Systems, Fittings Plan, Glass, Area and
Quantity. From this report the costs information doesn’t exist
on purpose.
The second part of the report contains joinery details on
sub-components. Practically every wing (frame, heel, glass) is
redrawn and displayed with the debit quotation of the elements that
contain them. The debit information are the same as the ones form
the Cutting
Quotations.
In the end the list of the accessories and the hardware is
displayed and will be used to finalize the joinery.

Execution Plan Report Options/b>
In different situations we might want to show only certain
information in the execution scheme. For example we might want to
show information only about the profiles and ignore the information
about hardware and accessory. The options allow us to extract
certain item categories (select consumption groups) and/or
differently group the data (select report group).